SHORT FILM

PIT

STILLS
⭐️

Connect to Content

Add layers or components to make infinite auto-playing slideshows.

CREDIT

Art Director

FOCUS

Prop Fabrication, Practical Effects, Set Dressing, Set Decorating, Distressing/Aging

Timeframe

3 weeks pre-production, 1 weekend shoot

BACKGROUND — apartment + basement of an alcoholic in a toxic relationship

BTS SET PHOTOS

LIVING ROOM
BATHROOM
KITCHEN
BEDROOM
MISC.
PROP FABRICATION — the concrete pit

REsearch

The main objectives for the fabrication of the pit: a seamless concrete exterior and waterproof interior for the black goo.
*Note: sketches by Christian Restad (Production Designer)

FABRICATION PROCESS

Started from concrete slab; hand carved, chiseled, and painted to imitate location floor. Included trapdoor mechanism for mimicking bubbles in the black goo.

Thanks for stopping by!

SHORT FILM

MANONGS

STILLS

CREDIT

Art Director

FOCUS

Set Dressing, Set Decorating, Prop Fabrication, Graphics, Credits, Poster

Timeframe

3 weeks pre-production, 2 weekend shoot